Villa renovation in Dubai — bare-shell handovers to twelve-month aftercare

从毛坯交付到十二个月售后。
返回全部服务

迪拜全屋别墅翻新——包括 Emaar NOC、DM 许可证、结构变更、木作、饰面、智能家居、景观。一个工作室,一份合同。

这是 Montaigne Design 内部承担的十二项服务之一。我们不会将房间中最关键的部分外包——图纸由我们的设计师绘制、木作由我们的工厂制作、灯光由我们的团队设计、采购由我们把控。承包商负责施工,我们负责设计与监督。

项目通常始于在迪拜或上海的私下沟通。我们的最低项目预算为 40 万迪拉姆,工作日内一日内回复。

Established in Shanghai in 2011. In Dubai since 2024 — forty-three hotels and sixty-five projects of discipline, now brought to private clients in the Gulf.

2011
Established, Shanghai
2024
Dubai studio
43
Hotels delivered
65
Projects
Villa renovation in Dubai's established communities
01

Villa renovation in Dubai's established communities

A villa renovation in Dubai looks different in every community, because the approvals, the plot sizes and the original build quality are not the same across the city. The studio takes on villa renovation across Palm Jumeirah, Emirates Hills, Dubai Hills Estate, Nad Al Sheba, Al Barari, District One at MBR City, Jumeirah Bay, Pearl Jumeirah, Al Wasl, Jumeirah, Umm Suqeim, Umm Al Sheif, Khawaneej and Dubai Creek Harbour — sea-facing Palm facades that have to survive salt and humidity, larger Emirates Hills and District One plots that ask for re-planning as much as refinishing, and Emaar bare-shell handovers that begin with a developer NOC.

Two delivered projects show the range. The Al Wasl Residence — an 8,000 m² plot with 2,400 m² built-up, designed for a three-generation Emirati family — and the Palm Beach House, a 12,000 m² plot with 3,000 m² built-up on Palm Jumeirah. Whether the property is a Palm signature villa, an Emirates Hills mansion or a Nad Al Sheba family home, the villa renovation is held to one standard: design first, approvals managed in-house, and a single contract for the whole of the work.

What a villa renovation in Dubai actually involves
02

What a villa renovation in Dubai actually involves

What a villa renovation in Dubai actually involves is far more than surfaces. The studio runs a seven-stage process: an initial enquiry, a chemistry meeting to test the fit between client and studio, then a site visit where load-bearing walls, MEP routing and slab capacity are checked before anything is promised. From there the work moves to concept and a 3D walk-through, material and FF&E selection, procurement and scheduling, site works, and finally handover.

Each stage is sequenced before the first wall is touched. Structural changes, wet-area relocation, HVAC and electrical upgrades and smart-home cabling are resolved before any finish is specified, because a finish applied over an unresolved service is a finish that will be opened up again. The work runs to a designer's logic, with the studio's craft and precision held the same way at every stage: custom joinery from the in-house atelier, stone and timber specified for the Gulf climate, lighting designed alongside the room rather than added at the end.

Because one studio holds the design, the approvals and the build, a villa renovation in Dubai with us does not lose its intent in the gaps between trades. The drawing that wins the brief is the drawing that is built, carried by a single named lead designer from the chemistry call to the snag list — the same person who signs the concept signs the handover.

Villa renovation in Dubai — what it actually costs
03

Villa renovation in Dubai — what it actually costs

What a villa renovation in Dubai costs is anchored to scope, not to floor area. The minimum project fee is AED 400,000, with no exceptions. Typical commissions sit in three bands: AED 1–3M for a single-residence refresh or partial renovation, AED 3–10M for a full villa renovation, and AED 10M and above for an estate-scale principal residence. Pricing is scoped per project after the site visit — the studio quotes a fixed design-and-build fee, not a percentage of spend.

The studio does not bill a percentage of construction cost on residential commissions, because that model creates a perverse incentive on a brief where the studio's job is to spend the client's money carefully. Two regulatory windows sit around the build: roughly one month for permits and clearances — Dubai Municipality, fire-fighting NOC, developer NOC — before site mobilisation, and roughly one month after site works for closure and authority sign-off.

How long does a villa renovation in Dubai take?
04

How long does a villa renovation in Dubai take?

Eighteen to twenty-two months is typical for a full villa renovation in Dubai. Eighteen months delivered the six-bedroom Al Wasl residence; twenty-two months delivered the twelve-thousand-square-metre Palm Jumeirah villa. The programme is set early, by the approvals and the structural scope, not by the finishes.

Inside that window: pre-construction permits run about one month; design phases three to four months; procurement and long-lead items — stone from Italy, FF&E from Italy, Spain and Turkey on eight-to-sixteen-week lead times — overlap with design rather than following it; and site works run ten to fourteen months. Handover, snagging and the contractual three-month and twelve-month aftercare visits sit beyond that. A villa renovation in Dubai that is rushed at the front — approvals skipped, structure left unresolved — is a renovation that overruns at the back.

Villa renovation in Dubai — the studio's process and aftercare
05

Villa renovation in Dubai — the studio's process and aftercare

A villa renovation in Dubai with the studio is carried by a single named lead designer, from the chemistry call to the twelve-month follow-up — the same person signs the concept and the snag list. That continuity is the difference between a renovation that photographs well on day one and a home that still reads correctly after a Dubai summer and a year of living in it.

The joinery is made in-house: an atelier of more than ten craftsmen, so the most important parts of the room do not wait on a third-party schedule. After-sale is treated with the same quality and precision as the build — both the three-month and twelve-month aftercare visits are written into the contract. The three-month visit catches hairline movement, door swings and settling; the twelve-month visit is a full review of every room, with timber re-oiled, upholstered pieces re-tensioned and every warranty item closed.

Related, across the studio's Dubai practice: villa renovation on Palm Jumeirah, Emirates Hills villa renovation, what a villa renovation in Dubai actually costs, apartment renovation in Dubai, the renovation hub.
从毛坯交付到十二个月售后。
Montaigne Design
服务内容
项目交付的四大支柱
Approvals & NOC — 别墅翻新 in Dubai
Approvals & NOC
Emaar NOC, DM permit, Nakheel approvals — we manage the full paperwork trail.
Structural & MEP — 别墅翻新 in Dubai
Structural & MEP
Structural changes, wet-area relocation, MEP upgrades — resolved before finishes begin.
Joinery & Finishes — 别墅翻新 in Dubai
Joinery & Finishes
Custom joinery from our Shanghai atelier. Stone, timber, ironwork specified for the Gulf climate.
Twelve-Month Aftercare — 别墅翻新 in Dubai
Twelve-Month Aftercare
Care manual, supplier contacts, warranty documents, +3-month and +12-month visits.
The process
How we work
01
聆听
首次会面,可能的话亲身见面。我们倾听客户所言,以及家庭真正所需。无图纸、无方案——只有专注。
02
现场与简报
我们到现场。测量、解读建筑、核对审批、结构限制、机电、防水及审批风险。书面简报由此产生。
03
概念
以材料、灯光与参考意象——而非渲染图——提出方向。概念确认后,才开始绘图。
04
概念方案与设计深化
图纸在与客户的对话中深化。样板、木作样品、灯光小样。房间在纸上解决,然后才在工地上解决。
05
招标与采购
招标文件发出。长交期的石材、木作、灯光与家具陈设开始采购。供应商名单由我们把控。
06
现场交付
每周到场。木作安装、饰面施工、问题及早纠正。主创设计师全程参与至完工。
07
交付与售后
完整的交付文件夹——保养手册、供应商联系、保修文件。+3 个月、+12 个月的售后回访。关系不止于项目完工。
精选作品
近期住宅项目

别墅翻新 across Dubai's communities

Common questions

Frequently asked

How much does villa renovation in Dubai cost?
The minimum project fee is AED 400,000. Most full villa renovations in Dubai sit between AED 3M and AED 10M depending on plot size, the level of structural intervention, and material specification, with estate-scale principal residences running above AED 10M. Pricing is scoped per project after the site visit — a fixed design-and-build fee, not a percentage of construction spend.
How long does a villa renovation in Dubai take?
A typical full villa renovation runs eighteen to twenty-two months. Permits take about one month; design three to four months; site works ten to fourteen months, with procurement and long-lead stone and FF&E overlapping the design phase. The contractual three-month and twelve-month aftercare visits sit beyond handover.
Do you handle the developer NOC for villa renovation in Dubai?
Yes — Dubai Municipality, TECOM, DMCC, JAFZA, DIFC, Civil Defence, the fire-fighting NOC, the property NOC and the developer NOC are all managed by the studio's in-house coordination team, so a villa renovation in Dubai does not stall waiting on an authority sign-off.
What's the difference between a villa renovation company in Dubai and a design studio?
Volume villa renovation companies sell renders on speculative bids and renegotiate the design back down to budget on site. Montaigne is a design-led studio that delivers what it draws — a single contract, a single named lead designer, in-house joinery, and a fixed fee quoted up front rather than recovered through variations.
Do you do villa renovation across all of Dubai?
Yes — Palm Jumeirah, Emirates Hills, Dubai Hills Estate, Al Barari, Nad Al Sheba, District One at MBR City, Jumeirah Bay, Pearl Jumeirah, Al Wasl, Jumeirah, Umm Suqeim, Umm Al Sheif, Khawaneej, Dubai Creek Harbour and Mirdif. Abu Dhabi (Saadiyat, Yas, Al Reem, Al Raha, Nurai) and the Northern Emirates are also served.
What's included in the twelve-month aftercare?
Both the three-month and twelve-month aftercare visits are contractual. The three-month visit covers hairline movement, door swings, settling and small adjustments. The twelve-month visit is a full review of every room — re-oiling of timber, re-tensioning of upholstered pieces, and the closing of all warranty items.